Fixed Building

The Volunteer 1

1

Stories

Burn Rooms

Overview

Tower Details

The Volunteer 1 is a single-story burn building that represents a single-story residence with an attached garage. The burn building features two rooms, two exterior doors, and one interior door providing the basics in fire training. Due to its durable structure, laddering and other frequently conducted training exercises may be conducted anywhere in the training building.

Endless Training Scenarios

Vertical Confined Spaces
Ventilation
Room Search / Clearing
Riser Operation
Live Fire Attack
Laddering and Rappelling
Helicopter Deployment
Forced Entry

Training Tower

1-Story
Tower

Dimensions 16’L x 24’W x 9’H
Roof 10° Single Pitch; 18-Gauge Steel
Roof Live Load 70 PSF
Wind Load Per Local Codes

Included

  • (1) 3′ x 7′ Exterior Steel Door
  • (1) 8′ x 7′ Exterior Double Leaf Steel Door
  • (1) 3′ x 7′ Interior Steel Door
  • (3) 3′ x 4′ Window Openings with Steel Shutters
  • (1) 4′ x 4′ Roof Chop-Out Curb
  • (1) Interior Room with 8′ x 7′ Double-Door Opening
  • (1) Burn Room with 3′ x 7′ Door Opening
  • (1) Westec™ Insulation System
  • (1) Scout Temperature Monitoring System

Training Tower

One Story (10’ H) story tower

Dimensions 16’L x 24’W x 9’H
Roof 10° Single Pitch; 18-Gauge Steel
Roof Live Load 70 PSF
Wind Load Per Local Codes

Included

  • (1) 3′ x 7′ Exterior Steel Door
  • (1) 8′ x 7′ Exterior Double Leaf Steel Door
  • (1) 3′ x 7′ Interior Steel Door
  • (3) 3′ x 4′ Window Openings with Steel Shutters
  • (1) 4′ x 4′ Roof Chop-Out Curb
  • (1) Interior Room with 8′ x 7′ Double-Door Opening
  • (1) Burn Room with 3′ x 7′ Door Opening
  • (1) Westec™ Insulation System
  • (1) Scout Temperature Monitoring System

Accessories

Configure it for the way you train

Temperature Monitoring

Land Area Requirements

Plan your site

Basic building site 1.00 acre
Drafting pit 0.20 acre
Vehicle extrication pad 0.20 acre
Rail car spill 0.60 acre
Tank truck spill/roll-over 0.20 acre
Flammable liquid pond 0.10 acre
Electric transformer pad 0.10 acre
Aircraft rescue pad 0.70 acre
Classroom building 0.30 acre
Garage 0.30 acre

Get Started

Build The Volunteer 1 for Your Department

Tell us about your training goals and site. Our team will help you configure this model, sections, accessories, and colors for the way you train.